(1)
Rochman, K.; Susetyo, B. Improvement of Cost Performance Accompanied by Quality Control Using Value Engineering and Six Sigma Methods in High-Rise Building Project.
IJET
2020
,
9
(2), 560-567.
https://doi.org/10.14419/ijet.v9i2.30880
.