Evaluation of Risk Management Capability of Public-Sector Participants in Build-Operate-Transfer Highway Projects in Nigeria

Authors

  • J.K. Fabi
  • R.A Hamid
  • M Mustapa
  • F.D Mustapa

How to Cite

Fabi, J., Hamid, R., Mustapa, M., & Mustapa, F. (2018). Evaluation of Risk Management Capability of Public-Sector Participants in Build-Operate-Transfer Highway Projects in Nigeria. International Journal of Engineering and Technology, 7(4.28), 109-114. https://doi.org/10.14419/ijet.v7i4.28.22562

Received date: November 30, 2018

Accepted date: November 30, 2018

Published date: November 30, 2018

DOI:

https://doi.org/10.14419/ijet.v7i4.28.22562

Abstract

Risks are inherent in BOT highway projects and have serious impact on its delivery. This paper seeks to evaluate the risk management capability of the public-sector participants involved in the execution BOT highway projects in Nigeria. Questionnaire survey was adopted to elicit information from experts who are active stakeholders in BOT highway construction in Nigeria. The population of the study comprises of government officials, contractors, concessionaires, bankers, consultant engineers and quantity surveyors, and academics. The study adopted stratified random sampling. Seventy-two (72) responses were obtained from One hundred and ten “110†questionnaires administered. The study adopted fuzzy synthetic evaluation (FSE) method in the analysis of data because of its ability to handle multi attributes and multi criteria nature of the problems. The result indicated that their risk management capability is below average, though not too poor. It was found that low awareness of risk management and its importance is responsible for low overall risk management capability of the public sector and this has hindered efficient and effective project delivery by the public-sector participants. The study concluded that there is need for public-sector participants to give more attention to risk management practice and application, embrace formal risk management with considerable training to further improve their risk management capability. 

Evaluation of Risk Management Capability of Public-Sector Participants in Build-Operate-Transfer Highway

Projects in Nigeria

References

  1. [1] Deng T. “Impacts of Transport Infrastructure on Productivity and Economic Growth: Recent Advances and Research Challengesâ€. Transport Reviews, 2013. 33(6), 686-689. (In English)

    [2] Obozuwa D.E. “PPP as a tool for Infrastructure development in Nigeriaâ€. Available http://www.businessdayonline.com/NG/index.php?option=com_content&view=article&id=15673:ppp-as-a-tool-for-infrastructure-development-in-nigeria-pt2&catid=133:legal-indignity&Itemid=557. 2010

    [3] Shatz H. J., Kitchens, K. E., Rosenbloom, S., Wachs, M. “Highway Infrastructure and the Economy, Implication for Federal Policyâ€. 2011. RAND Corporation Monograph Series, Santa Monica. (In English)

    [4] CIA website 2014. “The World Factbookâ€. https://www.cia.gov/library/publications/ resources/the-world-factbook/ (In English)

    [5] Salawu R. A. “Time Related Risk Assessment Framework for Highway Rehabilitation in Nigeriaâ€. Unpublished Thesis, Department of Quantity Surveying, Universiti Teknologi Malaysia. 2016. (In English)

    [6] El-Sayegh S., Mansour, M. “Risk Assessment and Allocation in Highway Construction Projects in the UAEâ€. Journal of management Engineering, 2015. Vol. 31, Issue 6 (In English)

    [7] Roumboutsos A., Pantelias, A. “Allocating Revenue Risk in Transport Infrastructure Public Private Partnership Projects: How it Mattersâ€. Transport Reviews. 2015. 35:2, 183-203, DOI: 10.1080/01441647.2014.988306 (In English)

    [8] Baum W.C, Tolbert S.M. “Investing in Development: Lessons of World Bank Experienceâ€. The World Bank, Oxford University Press, Oxford, 1995.

    [9] Infrastructure Bank. “Meeting Nigeria Infrastructure Funding Challengesâ€. Publications. Abuja, 2014.

    [10] Ren Y.T., Yeo, K.T. “Risk Management Capability Maturity Model for Complex Product Systems (CoPS) Projectsâ€. IEEE, 2004. (In English)

    [11] Hopkinson M. M. “The Project Risk Maturity Model: Measuring and Improving Risk Management Capabilityâ€, England, Gower Publishing Ltd., 2011.

    [12] Yeo K.T., Ren, Y.T. “'Risk management capability maturity model for complex product systems (CoPS) projectsâ€, Systems Engineering, 12(4), 2009. pp. 275–294. (In English)

    [13] Brookes N., Clark, R. “Using Maturity Models to Improve Project Management Practiceâ€. POMS 20th Annual Conference. POMS, May 1-4, 2009, Orlando, Florida USA (In English)

    [14] Zou P. X., Chen Y., Chan, T. “Understanding and improving your risk management capability: Assessment model for construction organisationsâ€. Journal of Construction Engineering and Management, ASCE, 2010. (In English)

    [15] Salawu R.A., Abdullah F. 2016. “Assessing Risk Management Maturity of Construction Organisations on Infrastructural Project Delivery in Nigeriaâ€. Procedia - Social and Behavioural Sciences, 172, 2016, 643 – 650 (In English)

    [16] Mu S., Cheng H., Chohr M., Peng W. “Assessing risk management capability of contractors in subway projects in mainland Chinaâ€. International Journal of Project Management, 32(3), 2014, 452–60. (In English)

    [17] Chou J., Tserng H.P., Lin C., Yeh, C. “Critical Factors and Risk Allocation for PPP Policy: Comparison between HSR and General Infrastructure Projectsâ€. Transport Policy. 22, 2012, 36-48 (In English)

    [18] Thomas A.V., Kalidindi S. N., Ganesh, L. S. “Modelling and assessment of critical risks in BOT road projectsâ€. Construction Management and Economics, 24, 2006, 407-424. (In English)

    [19] Ameyaw E. E., Chan, A. P. C. “Evaluating key risk factors for PPP water projects in Ghana: A Delphi studyâ€. Journal of Facility Management.,13(2), 2015a, 133–155. (In English)

    [20] Ameyaw E. E. “Risk allocation model for public-private partnership water supply projects in Ghanaâ€. Ph.D. thesis, Hong Kong Polytechnic Univ., Hong Kong. 2014. (In English)

    [21] Chung D., Hensher D. A., Rose, J. M. “Toward the betterment of risk allocation: Investigating risk perceptions of Australian stakeholder groups to public- private partnership toll road projectsâ€. Research on Transportation Economic., 30(1), 2010, 43–58. (In English).

    [22] Jin X., Zhang G. “Modelling Optimal Risk Allocation in PPP Projects using Artificial Neural Networksâ€. International Journal of Project Management, 29, 2011, 591–603. (In English)

    [23] Tolani O.V. “An Examination of Risk Perceptions and Allocation Preferences in Public-Private Partnerships in Nigeriaâ€. PhD Thesis, Interdisciplinary Graduate Program Calgary, Alberta, Canada, 2013. (In English)

    [24] Jin X. “Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australiaâ€. Journal of Construction Engineering and Management. 136, 2010, 138–150. (In English)

    [25] Jin X.-H., Doloi H. “Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspectiveâ€, Construction Management and Economics, 26(7), 2008, 707-721. (In English)

    [26] Thomas A.V., Kalidindi S. N., Ananthanarayanan K. “Risk perception analysis of BOT road project participants in Indiaâ€. Construction Management and Economics, 21, 2003, 393-407. (In English)

    [27] Ameyaw E. E., Chan A.P.C. “A Fuzzy Approach for the Allocation of Risks in Public–Private Partnership Water Infrastructure Projects in Developing Countriesâ€. Journal of Infrastructure Systems, 2016. (In English)

    [28] Boussabaine A. “Risk pricing strategies for public-private partnership projectsâ€. First edition, Wiley, Oxford, U.K., 2014.

    [29] Zhao X., Hwang B., Gao Y. “A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projectsâ€. Journal of Cleaner Production, 115, 2016, 203-213. (In English)

    [30] Ma J., Kremer G. E. O. “A fuzzy logic-based approach to determine product component end-of-life option from the views of sustainability and designer's perceptionâ€. Journal Cleaner Production, 108, 2015, 289-300. (In English)

    [31] Xia B., Chan A. P. C., Yeung, J. F. Y. “Developing a fuzzy multicriteria decision-making model for selecting design-build operational variationsâ€. Journal of Construction Engineering and Management, 137 (12), 2011, 1176-1184. (In English)

    [32] Zimmermann H. J. “Fuzzy set theory and its applicationsâ€. Fourth ed., Kluwer Academic Publishers. USA, 2001

    [33] Jato-Espino D., Castillo-Lopez E., Rodriguez-Hernandez J., Canteras-Jordana, J. C. “A review of application of multicriteria decision making methods in constructionâ€. Automation in Construction. 45, 2014, 151–162. (In English)

    [34] Fabi J.K., Awolesi J.A.B. “A Study of Risk Management Practice of Highway Projects in Nigeriaâ€. Journal of Economics and Sustainable Development www.iiste.org Vol.6, No.18, 2015, 171-177. (In English)

    [35] Del Caño A., De la Cruz M. P. “Integrated methodology for project risk managementâ€. Journal of Construction Engineering and Management ASCE 128(6). 2002, 473-485. (In English)

Downloads

How to Cite

Fabi, J., Hamid, R., Mustapa, M., & Mustapa, F. (2018). Evaluation of Risk Management Capability of Public-Sector Participants in Build-Operate-Transfer Highway Projects in Nigeria. International Journal of Engineering and Technology, 7(4.28), 109-114. https://doi.org/10.14419/ijet.v7i4.28.22562

Received date: November 30, 2018

Accepted date: November 30, 2018

Published date: November 30, 2018