A new approach to solving the time-cost trade-off problem based on the genetic algorithm and fuzzy theory

Authors

  • Nasser Shahsavari Pour

    Islamic Azad University, Iran
  • Arman Ghamginzadeh

  • Mansoor Pour Kheradmand

How to Cite

Pour, N. S., Ghamginzadeh, A., & Pour Kheradmand, M. (2012). A new approach to solving the time-cost trade-off problem based on the genetic algorithm and fuzzy theory. International Journal of Engineering and Technology, 1(3), 238-249. https://doi.org/10.14419/ijet.v1i3.137

Received date: June 19, 2012

Accepted date: June 20, 2012

Published date: July 8, 2012

DOI:

https://doi.org/10.14419/ijet.v1i3.137

Abstract

Time and cost are two important and controllable objectives in project structures which are considerably dependent on each other. Recently, beneficiaries’ demands for cost and time reduction in completing a project have been increased. This study proposes a new method for time-cost trade off problem (TCTP) in uncertainty condition. To solve the model a multi objective genetic algorithm has been integrated with fuzzy theory. Efficiency of this algorithm is demonstrated through an existing case example from the literature. Finally to make the algorithm more efficient the existing parameters in the model have been set through Taguchi method.

Downloads

How to Cite

Pour, N. S., Ghamginzadeh, A., & Pour Kheradmand, M. (2012). A new approach to solving the time-cost trade-off problem based on the genetic algorithm and fuzzy theory. International Journal of Engineering and Technology, 1(3), 238-249. https://doi.org/10.14419/ijet.v1i3.137

Received date: June 19, 2012

Accepted date: June 20, 2012

Published date: July 8, 2012